The main objectives of these step-by-step instructions are:
Power the Board and e-stop and test that the board activates/deactivates at hardware level only with e-stop.
Install the C25XP license and configure the pinout and functions of MACH4 supported by the C25XP and test that MACH3 is communicating with the C25XP OK.
Enable and configure the Safety Charge Pump to make sure the C25XP activates (green LED) when MACH3 becomes active (out of reset).
STEP 1: Connect an E-Stop button to short the E-Stop terminals.
This should give you a green LED while the board is powered and the e-stop is closed.
If not, check other possible fault conditions and make sure they are not active.
STEP 2: Make sure the controller is connected to an Ethernet port on the PC and powered with LEDs ON.
Open the program Mach3 and select the profile of your preference
Configuration
Configuration plugins
Enable ESS
OK
Restart Mach3
STEP 4:Download and copy the XML configuration file for Mach3 and save it in the Mach3 root directory. If you prefer to configure Mach4 and the Plugin Manually, you skip this step and follow these instructions
Save it to the Mach3 root folder. Rename it if you want to give your profile a specific name.
This should give you a green LED.
If not, check other possible fault conditions and make sure they are not active.